XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)

$225.98

“Long Lead” injector specific to cylinder #8 for quiet operation.

SKU: XD475-HVCD Category: Brand:

Additional information

Make

Ford

Model

Powerstroke

Vehicle Year

1999.5-2003

Reviews

There are no reviews yet.

Be the first to review “XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)”

Your email address will not be published. Required fields are marked *